Dartington Bridge

Construction carpentry

A new green oak timber frame bridge. Built to replace a poorly detailed softwood glue lam structure that had failed after only 7 years. With careful detailing and the use of durable green oak, we hope this oak timber frame bridge to last significantly longer.

Slide image Slide image Slide image Slide image Slide image Slide image

© 2024 EmanuelHendry. All rights reserved.
Instagram icon
Menu
Mobile logo
Instagram logo     Tel: 01647 281117   Email: info@emanuelhendry.co.uk